1.
Calculation of the walls of the road bridge Approach lift trailer to strength, located on the 165-km section of the M-39 Highway on the Syrdarya-Jizzakh line. Engineer [Internet]. 2026 Feb. 12 [cited 2026 Jul. 26];1(1):99-101. Available from: https://engineer.tstu.uz/index.php/engineer-tstu/article/view/176