[1]
“Organization and technology of manual laying of geosynthetic materials in technological ‘WINDOWS’ without removing the rail grating”, Engineer, vol. 1, no. 1, pp. 119–123, Feb. 2026, doi: 10.56143/3030-3893-2025-1S-119-123.