Calculation of the walls of the road bridge Approach lift trailer to strength, located on the 165-km section of the M-39 Highway on the Syrdarya-Jizzakh line. (2026). Международный научный журнал «Инженер», 1(1), 99-101. https://doi.org/10.56143/3030-3893-2025-1S-99-101